Completion year : January 2021
Quantities : 50 m²
Power output : 3,3 kWp
Estimated annual energy production: 2,25 MWh
Specifications
E-Activ’s scope of the work
- Design, planning, supply, and installation of the glass.
- Building system, engineering and installation.
- Electrical installation (DC), testing and commissioning
Application
BIPV Façade System: An active triple glazed curtain wall facade as part of a new building construction at the Diepenbeek campus of the University of Hasselt – Belgium exceptionally deployed to provide high glazing performances (thermal, acoustic,…) in combination with energy generation, shading and cooling properties for an excellent indoor climate. An aesthetic pleasing design demonstrating the versatility of the BIPV.